On August 6, a key decision in Elon Musk's strategy became known: SpaceX and Tesla have officially chosen the site for building the Terafab chip manufacturing plant. It will be Grimes County in Texas. The initial investment volume is $16.8 billion, which is only the first stage of an ambitious plan that could absorb up to $119 billion.

The scale of the project is impressive: the production complex will occupy 9.3 million square meters, combining semiconductor manufacturing, packaging, and testing under one roof. This is not just a plant, but a vertically integrated hub that will create at least 3,000 jobs for residents of Grimes and Brazos counties. Musk has already called Terafab "the largest and most valuable building on Earth."

Two chip lines under one roof

The enterprise will produce two categories of products. The first is chips for edge computing and inference, which will form the foundation of Tesla Optimus robots and Cybercab robotaxis. The second is high-performance solutions for SpaceX orbital data centers. Thus, Musk is closing the critical dependence on external suppliers in the two most strategic directions of his business.

The location was not chosen by chance: the plant will be situated near the Gibbons Creek reservoir, which previously served to cool a coal-fired power plant closed in 2018. The company has taken on a strict commitment—to draw water exclusively from this reservoir, without touching local groundwater sources. This is an important step to address the environmental concerns that inevitably arise with such megaprojects.

Legal structure and Intel's role

Notably, in the SpaceX IPO prospectus, the Terafab project is characterized as a "general framework." There are no binding agreements with Tesla in the documents: intellectual property rights are not allocated, and neither party has legal obligations to continue participation. This is a typical flexible structure for Musk, allowing maneuvering depending on market conditions.

Intel deserves special attention. The company announced its contribution to the project back in April but did not disclose details. In my assessment, it is Intel that will take on the main production part, given its expertise in advanced chip packaging.

Financial context and infrastructure load

The launch of Terafab coincided with unprecedented growth in SpaceX's spending on computing infrastructure. In the second quarter, capital expenditures increased more than sixfold year-over-year, reaching $18.37 billion, of which $15.83 billion went to the AI direction. Musk forecasts scaling up own capacity to 10 GW by the end of 2027.

It is telling that in parallel, SpaceX entered into a partnership with Nvidia: Starmind AI1 satellites will receive Rubin GPUs and Vera CPUs. Musk directly stated that AI infrastructure will be built exclusively on Nvidia equipment. This is sensible dualism: own production for the long-term strategy, purchases from the market leader for immediate tasks.

Controversial tax incentives

The project has sparked fierce debate at the local level. The Grimes County Council approved a full exemption from county property tax until 2036 in exchange for fixed payments: $10 million as a one-time payment and $20 million annually. However, upon publication of the documents, a discrepancy emerged: SpaceX claimed investments of $55 billion, while the agreement fixed only $5 billion by 2030. The possibility of exiting the project at any time with 30 days' notice also raised questions.

Company lawyers proposed an alternative calculation: the effective tax discount, considering fixed payments, would be about 78%, and the total amount of payments to the county over 35 years would reach $710 million. The environmental part was closed with commitments to build own gas-fired power plants and operate on a closed water cycle.

The first earthworks will begin shortly. This is a bold and at the same time risky step. On one hand, Terafab could become the core of Musk's new manufacturing ecosystem. On the other, the legal amorphousness of the project and vague obligations leave room for maneuvering but also create uncertainty for investors.

My verdict: Terafab is worth watching as an indicator of Musk's ability to scale chip production under strict environmental and tax constraints. If the project is realized even at half the stated scale, it will reshape the market for specialized semiconductors for robotics and space computing.